Client: Egegaz A.Ş.
Main Contractor: Yapı Merkezi A.Ş.
Total Site Area: 18,200 m²
Location: Aliağa, Türkiye
This project involved the execution of infrastructure works and tank foundations for an industrial energy facility developed for Egegaz A.Ş. in Aliağa, Türkiye. The scope was delivered under the main contractor Yapı Merkezi A.Ş., encompassing civil, structural, mechanical, and steel construction works tailored to heavy industrial and process-oriented operations.
The civil construction works included approximately 1,600 m² of reinforced concrete buildings, comprising an administrative building, MCC control building, generator building, and workshop facilities. In parallel, around 1,100 m² of steel-structure buildings were constructed, including workshops, chlorine buildings, bridges, and auxiliary industrial structures, designed to support operational continuity and safety requirements.
A significant portion of the project consisted of process piping systems, with the installation of approximately 6,500 meters of stainless steel piping and 20,000 meters of carbon steel piping, covering both above-ground and underground networks. The scope also included fire water piping systems, ensuring compliance with industrial fire protection and safety standards.